¡¡
Chinese English ¼òÌåÖÐÎÄ°æ
COMPANY NEWS

Friendship link

  • www.prodrill.com.cn
  • Home >> NEWS >> COMPANY NEWS
    Basic Operation: Perforation
    Release Date£º[2009-4-23]      Press Release£º

    Basic operation: perforation

    As in the case of conventional operations, if the drill hole has not been made according to instructions, the demolition will fail.

    1.   Drill hole diameter: 32 to 40 mm. At temperatures of over 25º, the maximum diameter must be 40 mm.

    2.   Distance between holes = drill bit diameter x 10

    3.   Depth: Can reach up to 10 m. The maximum height will be 0.60 m.

    Consumption of Buster by Cras per metre of depth according to the diameter of the drill bit used.

    Weight:

    1,40 kg

    3,25 kg

    5,30 kg

    Diameter

    32 mm

    50 mm

    65 mm

    The above references will serve as guidelines, but, in all cases, we recommend you to make a preliminary test with few holes.

    ¡¾Print this page¡¿¡¾Top¡¿¡¾Close¡¿